Canonical vocabulary

Shipbuilding build-state terms, defined once.

Each links to the page where it does the work.

The company and the two systems

Veldarium is the company. VeldBuild holds governed state. VeldMind reasons over it. A named person authorizes. They are not one product with a feature list.

Veldarium
Veldarium is an American industrial technology company building toward AI-native shipbuilding: governed build state first, then bounded reasoning over it, production cells that execute only released work, a yard, and in time vessels, each opened by evidence from the step before. Today that means software: governance engines tested in Veldarium’s code, and public demonstrations on synthetic records.Company
VeldBuild
VeldBuild is governed execution and production control: the deterministic, authoritative build-state system that preserves source authority, computes governed state, establishes whether work may start, and records approved transitions. It remains useful with no AI present.VeldBuild
VeldMind
VeldMind is orchestration and bounded reasoning operating over VeldBuild state. It works out what deserves attention, traces the consequence paths a change opens, identifies missing evidence, preserves disagreement, abstains where the records cannot settle a question, and returns a traceable recommendation to the named person who decides.VeldMind
Named human authority
Consequential industrial authority is assigned to a named person or role with an explicit scope. That person holds the decision. The software informs it and never makes it.Systems
Physical execution
People, suppliers, equipment, automation, workcells and facilities execute approved work. Evidence from that work returns to governed state before later work relies on it.Industrial Base

How a fact is established

Industrial logic is three-valued. Unknown is its own state. It is never counted as ready and never collapsed into false.

Build state
The governed answer to what is true about engineering, material, work, quality, physical configuration, and authority at a point in time.VeldBuild
Three-valued readiness
A policy evaluation over required gates and governed evidence, answering READY, NOT_READY, or CANNOT_ESTABLISH. Ready means every required gate is established. Known-open is not ready. Unknown is never treated as a yes or a no.VeldBuild
Impact-not-established
A node related to a change by topology, but with no assessment evidence. It is never silently treated as unaffected. Change impact is known-affected, known-not-affected, or impact-not-established.VeldBuild
Hold point
A required stop in the work where specified evidence and authorization must exist before continuation.VeldBuild

What the build is made of

The objects are typed, identified, and revisioned. A pile of documents is not a build graph.

Build Graph
The typed network of vessel, engineering, supply, work, quality, authority, and evidence objects plus the declared relationships between them.VeldBuild
Configuration
The approved definition and applicability of an object, including baseline, revision, effectivity, deviations, and supersession.VeldBuild
Effectivity
The boundary that determines where and when an approved definition governs. The newest revision is not automatically effective for every hull, zone, or work package.VeldBuild
Work package
A bounded unit of physical work with identity, scope, governing configuration, dependencies, resources, gates, evidence, and a responsible owner.VeldBuild
As-built
The accepted record of what was actually installed or produced, including approved departures from design intent and the evidence establishing them.VeldBuild
NCR
A nonconformance report: a controlled record of a condition that does not meet a requirement and requires disposition by the responsible authority.VeldBuild

Evidence and authority

A record is not evidence until authority, applicability, and time hold. Integration does not transfer source authority to VeldBuild.

Evidence
A record admissible for a stated fact, scope, and time. Presence alone is insufficient; authority and applicability must also hold.VeldBuild
Provenance
The resolvable lineage from a governed assertion back to its source record, revision, observation time, authority, and ingest path.VeldBuild
Authoritative source
The system, record, or named authority permitted to establish a specific class of fact. Integration does not transfer that authority to VeldBuild.VeldBuild
Source authority
The rule that states which originating system or role controls a fact class when multiple systems contribute candidate assertions.VeldBuild
System of record
Always scoped, never absolute. A source system is the system of record for the facts it owns: PLM for released engineering configuration, ERP for material transactions, QMS for recorded acceptance. VeldBuild is the system of record for governed build state: which of those facts governs a named subject now, whether the evidence still establishes it, what a released change reaches, and the approved decisions recorded against it. It never becomes the system of record for a fact a source system owns.VeldBuild
Admissibility
Whether a record may bear on a claim at all, asked before its contents are examined. A source permitted only to contribute never decides, however many contributing records agree; a source not permitted at all never enters the answer, so it can never be outvoted into relevance. The evidence engines execute this on synthetic records: an operation-completion signal from an execution system does not close a quality hold point, because the floor reporting completion is not an inspection accepting the work.VeldBuild

Bounded reasoning

VeldMind proposes. It does not convert an unknown gate into a proceed, and it does not write approved state.

Governed context
The smallest permitted set of current build state, evidence, source authority, policy, effectivity, and uncertainty needed to answer one bounded question.VeldMind
Reasoner
A bounded deterministic tool, graph query, solver, model, service, or human specialist selected to answer one sub-question. No model of any provider is connected in the public demonstration.VeldMind
Verifier
A check that tests source existence, authority, applicability, consistency, computation, policy, scope, or completeness.VeldMind
Recommendation
What VeldMind returns to a named person: a proposed action with its evidence, its trace and the condition that would falsify it. It authorizes nothing.VeldMind
Decision
A named person’s recorded act on a recommendation: approve, hold, or return for evidence. Approve is open only when every consulted domain is clear.VeldMind
Acceptance
The recorded judgement of the responsible quality authority that work meets its criteria. Recording a result is not accepting it, and a sensor reading is an input to acceptance, never an acceptance.VeldBuild
Bounded execution
An authorized action constrained by explicit scope, consequence, reversibility, policy, logging, and revocation rules. Architectural direction, not a deployed capability.VeldMind

How maturity is labeled

Planned is not implemented. Implemented is not deployed. Synthetic is not a customer result. Repository tests are not production assurance.

Synthetic demonstration
Executable behavior over invented data. It shows how the implementation behaves, not how it performs on a real program. Every demonstration on this site is synthetic and says so where it runs.Trust
Maturity labels
Working, Building, Synthetic, Concept, Exploratory, Target, Long-term, Not claimed, Source-backed, Human-authorized. Each says how far a claim has been earned, or, for Source-backed and Human-authorized, what kind of claim it is. Each is defined once, in the status key on Trust.Trust
Concept vessel
The concept for a modular uncrewed surface vessel, used for public demonstration. Length overall is a 50 m (about 165 ft) concept dimension. Beam, draft, depth, displacement, class, and regulatory basis are not established. It is not a customer vessel, not classed, and not under contract.Trust
Demonstrated vs direction
Demonstrated runs in the deterministic synthetic demonstration today. Direction is architectural intent that is not built. Provider-neutral model routing, bounded execution, and automatic write-back are direction.Trust
Repository evidence
Code, tests, fixtures, or configuration that demonstrate an implementation property in Veldarium’s code.Trust
Production evidence
Evidence from a deployed, monitored operating environment. Veldarium currently claims none for shipyard operation or live enterprise connectors.Trust

Enterprise source systems

VeldBuild is a governed build-state control plane, not a replacement for the systems a yard already runs. Every connector status is target. None is built.

PLM
Product lifecycle management. Typically remains authoritative for engineering definition and revision. Veldarium has no production PLM connector.Systems
ERP
Enterprise resource planning. Typically remains authoritative for commercial, inventory, and order facts. Veldarium has no production ERP connector.Systems
MES
Manufacturing execution. Typically remains authoritative for shop-floor execution records. Veldarium has no production MES connector.Systems
QMS
Quality management. Typically remains authoritative for inspection plans, nonconformances, and acceptance records. Veldarium has no production QMS connector.Systems
BOM
Bill of material: the structured list of items a work package or assembly consumes. Material readiness is a fact about that list, not a date field.Systems

Physical construction

The company destination is vessels. These terms name the physical work the software is being built toward. Veldarium performs none of it today.

Block construction
Building the ship as modules that can be outfitted while still open, then joined. Access and sequence are designed, not discovered at the work face.Shipbuilding
Outfitting
Installing systems, equipment, and furnishings into structure. Pre-outfitting does this while a block is still open and accessible.Shipbuilding
Erection
Joining blocks and units on the ways, dock, or land level into the hull. Crane, line occupancy, and dimensional control constrain the sequence.Shipbuilding
Commissioning
Testing installed systems against the governing requirements until they can be accepted. Late commissioning often exposes unresolved upstream dependencies.Shipbuilding