Engineering change management, followed past the drawing: when a configuration change is released, trace it to the work, material, inspection and schedule it actually affects. Mark honestly what cannot be traced.
- Records
- Released work
- Physical build
- Human authority
What happensA design revision lands after fabrication has started. Material, work packages, inspections and the next blocks may all inherit it.
The route is re-released, Records
CFG-029 moves DR-118 from Rev C to Rev D on the seawater-cooling route, while the crew is at the bench.
The reach is traced, Records
Every governed object related to the drawing family becomes a candidate. Related-with-no-assessment is its own state, never a quiet "unaffected".
Released work is re-evaluated, Released work
Two objects it reaches are affected and must be re-evaluated before release (work package and material). One is known not affected, because an assessment cleared it. One has no assessment and stays impact not established.
The consequence reaches steel
Steel is already cut, Physical build
Material cut to Rev C is either still good or is rework, and nothing at the bench looks different either way.
Configuration authority decides, Human authority
What proceeds, what is re-released at Rev D, and what comes back out. The impact set is evidence for that call, not the call.
How VeldBuild answers it
What did CFG-029 affect? And what did it explicitly not affect?
What it reads
- Scope
- The declared Build Graph neighborhood of one change: affected configuration objects, work packages, material, inspections, and schedule dependencies.
- Records
- Engineering change notice and revision lineage · Work packages written against the affected object · Material specified at the prior revision · Inspection and acceptance criteria · Downstream schedule dependencies
- Evidence it needs
- Change notice · Revision lineage and supersession edges · Affected work-package references · Affected material and inspection records
What it computes
- Steps
- Follow the change to everything it is declared to touch
- Call nothing affected or not affected without evidence
- Keep an unmodeled or unverified relation as impact not established
- Output
- What the change reaches, what it does not, and what nobody has assessed yet, each with an owner.
What stays with people
- Left unknown
- An unmodeled dependency
- Missing applicability or effectivity evidence
- An affected object without completed disposition evidence
- Decided by
- VeldBuild reports affected, not affected, and impact-not-established; it does not invent a relation it cannot trace
- Engineering dispositions the change and everything it leaves unresolved
What would prove it on real records
- Test
- Run it against a controlled slice of real PLM dependencies and measure, on reviewed changes, what it found, what it missed, what it left open and how dispositions closed.
Questions that usually come next
- Which affected objects still need action, and who owns them?
- Where is the impact simply not established from the available data?